51 |
|
Engineering design and product development and its relationship to manufacturing: A programme of case study research in British companies
|
Braiden, P. M.;Alderman, N.;Thwaites, A. T.
|
Elsevier
|
1992
|
|
|
52 |
|
Determining the number of spares in an inventory/repair system which supports equipment with scheduled usage
|
Bridgman, M. S.;Mount-Campbell, C. A.
|
Elsevier
|
1992
|
|
|
53 |
|
The appraisal of industrial investments: A new method and a case study
|
Gallo, P.;Peccati, L.
|
Elsevier
|
1992
|
|
|
54 |
|
Batch-scheduling problems to minimize inventory cost in the shop with both receiving and delivery just in times
|
Halim, A. H.;Ohta, H.
|
Elsevier
|
1992
|
|
|
55 |
|
Analysis of the conversion from a job shop system to a cellular manufacturing system
|
Durmusoglu, M. B.
|
Elsevier
|
1992
|
|
|
56 |
|
Using a knowledge-based decision support system development environment to implement a scheduling system for a workshop
|
Klein, M.;Lecomte, C.;Dejax, P.
|
Elsevier
|
1992
|
|
|
57 |
|
Architectural framework for the design of a simulation environment for decentralized production management
|
Kruse, C.;Zell, M.;Scheer, A.-W.
|
Elsevier
|
1992
|
|
|
58 |
|
A practical solution to a newspaper distribution problem
|
Mantel, R. J.;Fontein, M.
|
Elsevier
|
1992
|
|
|
59 |
|
A method of flexible scheduling for flexible manufacturing systems
|
Choi, J.;Hitomi, K.
|
Elsevier
|
1992
|
|
|
60 |
|
Incentives and productivity measurements
|
Bogetoft, P.
|
Elsevier
|
1992
|
|
|