1 |
|
Optimal flow control of flexible manufacturing systems: Setup localization by an iterative procedure
|
Kogan, K.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
2 |
|
Yield comparison of push and pull control methods on production systems with unreliable machines
|
Ou, J.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
3 |
|
Process reengineering: A review of enablers
|
Love, P. E. D.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
4 |
|
Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
|
Sarker, B. R.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
5 |
|
A note on scheduling of two-stage flow shop with multiple processors
|
Suresh, V.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
6 |
|
Economic and strategic justification of AMT Inferences from industrial practices
|
Small, M. H.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
7 |
|
Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation
|
Fumero, F.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
8 |
|
Investigation of chip formation during milling
|
Kovac, P.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
9 |
|
Real-time operational control of an FMS with full routing flexibility
|
Byrne, M. D.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
10 |
|
Innovation paths in product development: An empirical research
|
Calderini, M.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|