| 1 |
|
A branch and bound algorithm for scheduling just-in-time mixed-model assembly lines
|
Ng, W. C.;Mak, K. L.
|
Elsevier
|
1992
|
|
|
|
| 2 |
|
A capacitated single-item lot-size model
|
Rosling, K.
|
Elsevier
|
1992
|
|
|
|
| 3 |
|
Adaptive diagnostic procedure for failures in series system
|
Gao, J.;Ait-Kadi, D.
|
Elsevier
|
1992
|
|
|
|
| 4 |
|
A method of flexible scheduling for flexible manufacturing systems
|
Choi, J.;Hitomi, K.
|
Elsevier
|
1992
|
|
|
|
| 5 |
|
A multiple criteria approach to machine selection for flexible manufacturing systems
|
Myint, S.;Tabucanon, M. T.
|
Elsevier
|
1992
|
|
|
|
| 6 |
|
Analysis of the conversion from a job shop system to a cellular manufacturing system
|
Durmusoglu, M. B.
|
Elsevier
|
1992
|
|
|
|
| 7 |
|
An economic manufacturing quantity model with learning effects
|
Cheng, T. C. E.
|
Elsevier
|
1992
|
|
|
|
| 8 |
|
An expert system for a local planning environment
|
Meester, G. J.
|
Elsevier
|
1992
|
|
|
|
| 9 |
|
An expert system for choosing demand forecasting techniques
|
Lo, T.
|
Elsevier
|
1992
|
|
|
|
| 10 |
|
An integrated approach to the layout of flexible transfer lines (FTLs): Buffer Stocks Allocation
|
Abdel-Malek, L.;Tang, C.
|
Elsevier
|
1992
|
|
|
|
| 11 |
|
An integration approach to process design and parts-layout planning
|
Ohashi, K.
|
Elsevier
|
1992
|
|
|
|
| 12 |
|
An optimal operation planning for the fixed quantity withdrawal kanban system with variable leadtimes
|
Yanagawa, Y.;Miyazaki, S.;Ohta, H.
|
Elsevier
|
1992
|
|
|
|
| 13 |
|
A practical solution to a newspaper distribution problem
|
Mantel, R. J.;Fontein, M.
|
Elsevier
|
1992
|
|
|
|
| 14 |
|
Architectural framework for the design of a simulation environment for decentralized production management
|
Kruse, C.;Zell, M.;Scheer, A.-W.
|
Elsevier
|
1992
|
|
|
|
| 15 |
|
A simulation study of hypothesis tests for differences in efficiencies
|
Banker, R. D.; Chang, H.
|
Elsevier
|
1992
|
|
|
|
| 16 |
|
A simulation study of unit exchange spares management of diesel locomotives in Indian railways
|
Kumar, N.;Vrat, P.;Sushil
|
Elsevier
|
1992
|
|
|
|
| 17 |
|
Assessing marginal impacts of investments on the performance of organisational units
|
Athanassopoulos, A. D.; Thanassoulis, E.
|
Elsevier
|
1992
|
|
|
|
| 18 |
|
Assessing marginal impacts of investments on the performance of organisational units: Comments
|
Olesen, O. B.; Petersen, N. C.
|
Elsevier
|
1992
|
|
|
|
| 19 |
|
A study of heuristics of bi-directional multi-hoist production scheduling systems
|
Sun, T. C.;Lai, K. K.;Lam, K. K.;So, K. P.
|
Elsevier
|
1992
|
|
|
|
| 20 |
|
A theoretical framework for understanding why JIT reduces cost and cycle time and improves quality
|
Miltenburg, J.
|
Elsevier
|
1992
|
|
|
|