| 1 |
|
A comment on Martin's Note on an EOQ model with a temporary sale price
|
Goyal, S. K.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 2 |
|
A comparison of two electronic idea generation techniques
|
Aiken, M.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 3 |
|
A fuzzy decomposition method for multistation production systems subject to blocking
|
Tan, B.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 4 |
|
A fuzzy pooling of investment cost knowledge
|
Dohnal, M.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 5 |
|
Aggregate planning with continuous time
|
Dobos, I.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 6 |
|
A hybrid econometric-neural network modeling approach for sales forecasting
|
Luxhoej, J. T.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 7 |
|
A model and instrument for measuring small business user satisfaction with information technology
|
Palvia, P. C.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 8 |
|
An analytical comparison of inventory costs between the pull and the parts-oriented production systems
|
Miyazaki, S.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 9 |
|
An efficient heuristic procedure for the single-item, discrete lot sizing problem
|
Canel, C.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 10 |
|
An empirical investigation of the contribution of IS to manufacturing productivity
|
Gupta, U. G.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 11 |
|
A new concept of job shop scheduling system - hierarchical decision model
|
Tagawa, S.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 12 |
|
An inventory model for items with demands satisfied from stock or by special deliveries
|
Hollier, R. H.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 13 |
|
A production ordering system for two-item, two-stage, capacity-constraint production and inventory model
|
Ishii, K.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 14 |
|
A structural model of end user computing satisfaction and user performance
|
Etezadi-Amoli, J.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 15 |
|
A study of production management system with MRP
|
Nakagiri, D.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 16 |
|
A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times
|
Franca, P. M.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 17 |
|
A technical note on using work sampling to estimate the effort on activities under activity-based costing
|
Tsai, W.-H.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 18 |
|
A transaction cost approach to outsourcing behavior: Some empirical evidence
|
Aubert, B. A.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 19 |
|
Batching in production planning for flexible manufacturing systems
|
Srivastava, B.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 20 |
|
Batching policies for linearly increasing demand with a finite input rate
|
Hill, R. M.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|