| 1 |
|
A CAD system based on haptic modelling for conceptual design
|
Bordegoni, M.; Cugini, U.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 2 |
|
Achieving excellence in product development by resolving quality and warranty issues upstream, while reducing lead-time
|
Noor, M.J.; Whitney, D.E.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 3 |
|
A concurrent engineering system to integrate a production simulation and CAD system for FTL layout design
|
Yamamoto, H.; Qudeiri, J.A.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 4 |
|
A methodology for the performance analysis of product validation and test plans
|
Zakarian, A.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 5 |
|
An artificial immune system-based algorithm to solve linear and loop layout problems in flexible manufacturing systems
|
Kumar, R.M.S.; Asokan, P.; Kumanan, S.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 6 |
|
An implementation of resource-negotiating agents in telemanufacturing
|
van Zyl, T.L.; Ehlers, E.M.; Marais, E.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 7 |
|
An improved heuristic and an exact algorithm for the 2D strip and bin packing problem
|
Bekrar, A.; Kacem, I.; Chu, C.; Sadfi, C.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 8 |
|
An integrated product-process-organisation model to manage design systems
|
Robin, V.; Girard, P.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 9 |
|
A process modelling and simulation approach for business decision support in pre-conceptual product design
|
Lofstrand, M.; Isaksson, O.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 10 |
|
A proposition of 3D inertial tolerancing to consider the statistical combination of the location and orientation deviations
|
Adragna, P.-A.; Samper, S.; Pillet, M.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 11 |
|
A scatter search algorithm for scheduling optimisation of job shop problems
|
Saravanan, M.; Haq, A.N.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 12 |
|
A study of maintenance contribution to a joint production and preventive maintenance scheduling problem in the robustness framework
|
Benbouzid-Sitayeb, F.; Bendjoudi, A.; Benkhallat, S.; Varnier, C.; Zerhouni, N.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 13 |
|
Automotive warranty data: stratification approach for estimating the mean cumulative function
|
Christozov, D.; Chukova, S.; Robinson, J.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 14 |
|
Barriers and obstructive practices for out-of-the-box creativity in groups
|
Lempiala, T.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 15 |
|
Blending creativity and structure in implementing a novel idea
|
Beckett, R.C.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 16 |
|
Can structures foster creativity and innovation? The propositions based on a Giddens-inspired framework
|
Kobe, C.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 17 |
|
Conjoint-HoQ: evolving a methodology to map market needs to product profiles
|
Olewnik, A.; Hariharan, V.G.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 18 |
|
Design for electronic equipment reliability in complex systems
|
Poncelin, G.; Cauvin, A.; Glade, M.; Lyonnet, P.; Dufrene, D.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 19 |
|
Developing a trade-off between upgrade action time and warranty length for second-hand electrical components
|
Shafiee, M.; Saidi-Mehrabad, M.; Asgharizadeh, E.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|
| 20 |
|
Ex-CLASS: Extended Cell formation and LAyout Selection considering production parameters with Sequence data
|
Dixit, A.R.; Mishra, P.K.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
|