1 |
|
A generalised cost-estimation model for job shops
|
Aderoba, A.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
2 |
|
A genetic algorithm-based approach for design of independent manufacturing cells
|
Moon, C.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
3 |
|
A genetic algorithm-based planning system for PCB component placement
|
Khoo, L. P.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
4 |
|
A genetic algorithm method for one-dimensional machine location problems
|
Gong, D.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
5 |
|
A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
|
Dellaert, N.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
6 |
|
A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
|
Cavory, G.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
7 |
|
A graph-based approach for rule integrity and maintainability in expert system maintenance
|
Higa, K.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
8 |
|
A group decision support system for multilingual groups
|
Aiken, M. W.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
9 |
|
Gaining the benefits of integrated manufacturing technology - just who benefits and how?
|
Thomas, P.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
10 |
|
Generalized inspection strategy for randomly failing systems subjected to random shocks
|
Chelbi, A.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
11 |
|
Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
|
Li, Y.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
12 |
|
Genetic algorithm optimisation of a class of inventory control systems
|
Disney, S. M.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
13 |
|
Geographic information systems in warehouse site selection decisions
|
Vlachopoulou, M.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
14 |
|
Global information technology: a meta analysis of key issues
|
Palvia, P. C.; Jain Palvia, S. C.; Whitworth, J. E.
|
ELSEVIER SCIENCE DIVISION
|
2002
|
|
|
15 |
|
Global relations between inventory, manufacturing lead time and delivery date promises
|
Vastag, G.
|
ELSEVIER SCIENCE DIVISION
|
1993
|
|
|
16 |
|
Greedy heuristic algorithms for manpower shift planning
|
Lagodimos, A. G.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
17 |
|
Group decision support systems and incentive structures
|
Shirani, A.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
18 |
|
Grouping of parts and machines in presence of alternative process routes by genetic algorithm
|
Uddin, M. K.; Shanker, K.
|
ELSEVIER SCIENCE DIVISION
|
2002
|
|
|
19 |
|
Group technology concepts as applied to flexible manufacturing systems
|
Radharamanan, R.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
20 |
|
GSS participation: A cultural examination
|
Robichaux, B. P.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|