181 |
|
A Heton Perspective of Baroclinic Eddy Transfer in Localized Open ocean Convection
|
Legg, S
|
American Meteorological Society
|
1980
|
|
|
182 |
|
A heuristic algorithm for a multi-product dynamic lot-sizing and shipping problem
|
Lee, W. S.; Han, J. H.; Cho, S. J.
|
Elsevier Science B.V., Amsterdam.
|
2005
|
|
|
183 |
|
A Heuristic Algorithm for the Heath—Jarrow—Morton Model
|
Do, Hung; Tomas, Michael J.
|
Institutional Investor
|
2016
|
|
|
184 |
|
A heuristic approach based on shortest path problems for integrated flight, aircraft, and passenger rescheduling under disruptions
|
Jozefowiez, N.; Mancel, C.; Mora-Camino, F.
|
Published by Pergamon Press for Operational Research Society
|
2013
|
|
|
185 |
|
A Heuristic Approach to Placement Sequences Identification for SMT
|
Shih, W.
|
WELA PUBLICATIONS LTD
|
1993
|
|
|
186 |
|
A Heuristic Approach to Product Design
|
Rajeev Kohli ; Ramesh Krishnamurti
|
I N F O R M S
|
|
|
|
187 |
|
A Heuristic Extended Kalman Filter Based Estimator for Fault Identification in a Fluid Catalytic Cracking Unit/
|
Huang, Y
|
American Chemical Society
|
2003
|
|
|
188 |
|
A heuristic for balancing the inventory level of different locations through lateral shipments
|
Tiacci, L.; Saetta, S.
|
Elsevier Science B.V., Amsterdam.
|
2011
|
|
|
189 |
|
A heuristic for bi-objective vehicle routing with time window constraints
|
Hong, Sung-Chul
|
Elsevier
|
1999
|
|
|
190 |
|
A heuristic for component switching on SMT placement machines
|
Gronalt, M
|
Elsevier
|
1997
|
|
|
191 |
|
A heuristic for component switching on SMT placement machines
|
Gronalt, M.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
192 |
|
A heuristic for incorporating ancillaries into air choice models with personalization (Part 1: estimating preferences using hedonic regression)
|
M. Sznajder ; R. Ratliff ; C. Kaya
|
Henry Stewart Pub.
|
2023
|
|
|
193 |
|
A heuristic for incorporating ancillaries into air choice models with personalization (part 2: integrated multinomial logit and hedonic regression models)
|
M. Sznajder ; R. Ratliff ; C. Kaya
|
Henry Stewart Pub.
|
2023
|
|
|
194 |
|
A heuristic for network project scheduling with random activity durations depending on the
|
Golenko-Ginzburg, Dimitri
|
Elsevier
|
1998
|
|
|
195 |
|
A heuristic for network project scheduling with random activity durations depending on the resource allocation
|
Golenko-Ginzburg, D.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
196 |
|
A heuristic for replenishment of deteriorating items with a linear trend in demand
|
Kim, D. H.
|
ELSEVIER SCIENCE DIVISION
|
1995
|
|
|
197 |
|
A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness
|
Framinan, J. M.; Leisten, R.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
198 |
|
A heuristic for solving mixed-model line balancing problems with stochastic task durations and
|
McMullen, Patrick R
|
Elsevier
|
1997
|
|
|
199 |
|
A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
|
McMullen, P. R.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
200 |
|
A heuristic for the Minimum Score Separation Problem, a combinatorial problem associated with the cutting stock problem
|
Becker, Kai Helge; Appa, Gautam
|
Published by Pergamon Press for Operational Research Society
|
2015
|
|
|