| 201 |
|
A heuristic for network project scheduling with random activity durations depending on the resource allocation
|
Golenko-Ginzburg, D.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
|
| 202 |
|
A heuristic for replenishment of deteriorating items with a linear trend in demand
|
Kim, D. H.
|
ELSEVIER SCIENCE DIVISION
|
1995
|
|
|
|
| 203 |
|
A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness
|
Framinan, J. M.; Leisten, R.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 204 |
|
A heuristic for solving mixed-model line balancing problems with stochastic task durations and
|
McMullen, Patrick R
|
Elsevier
|
1997
|
|
|
|
| 205 |
|
A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
|
McMullen, P. R.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
|
| 206 |
|
A heuristic for the Minimum Score Separation Problem, a combinatorial problem associated with the cutting stock problem
|
Becker, Kai Helge; Appa, Gautam
|
Published by Pergamon Press for Operational Research Society
|
2015
|
|
|
|
| 207 |
|
A Heuristic for the Multisource Weber Problem with Service Level Constraints
|
Venkateshan, Prahalad; Mathur, Kamlesh
|
Transportation Science & Logistics Society of INFORMS
|
2015
|
|
|
|
| 208 |
|
A heuristic job-shop scheduling algorithm to minimize the total holding cost of completed and in-process products subject to no tardy jobs
|
Ohta, H.; Nakatani, T.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 209 |
|
A heuristic Lagrangian stochastic particle model of relative diffusion: model formulation and preliminary results/
|
Du, Shuming
|
Pergamon
|
2001
|
|
|
|
| 210 |
|
A Heuristic Lot Size Reorder Point Model for Decaying Inventories
|
Steven Nahmias ; Shan Shan Wang
|
I N F O R M S
|
|
|
|
|
| 211 |
|
A heuristic method for detecting problems in business process models
|
Gruhn, V.; Laue, R.
|
Emerald Group Publishing Limited
|
2010
|
|
|
|
| 212 |
|
A heuristic method for parameter selection in LS-SVM: Application to time series prediction
|
Rubio, G.; Pomares, H.; Rojas, I.; Herrera, L. J.
|
Elsevier Science B.V., Amsterdam.
|
2011
|
|
|
|
| 213 |
|
A heuristic methodology to evaluate price discount structures from the buyer's perspective
|
Madan, M.
|
ELSEVIER SCIENCE DIVISION
|
1993
|
|
|
|
| 214 |
|
A Heuristic Procedure for the Layout of a Large Number of Facilities
|
Zvi Drezner
|
I N F O R M S
|
|
|
|
|
| 215 |
|
A heuristic procedure for the two-level control of serial supply chains under fuzzy customer demand
|
Xie, Y.; Petrovic, D.; Burnham, K.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 216 |
|
A heuristic procedure to identify the most valuable chain of patent priority network
|
Su, F. P.; Yang, W. G.; Lai, K. K.
|
Elsevier Science B.V., Amsterdam.
|
2011
|
|
|
|
| 217 |
|
A heuristic project scheduling approach for quick response to maritime disaster rescue
|
Yan, L.; Jinsong, B.; Xiaofeng, H.; Ye, J.
|
Elsevier Science B.V., Amsterdam.
|
2009
|
|
|
|
| 218 |
|
A Heuristic Risk Assessment Technique for Birdstrike Management at Airports
|
Allan, J.
|
Blackwell Publishing Ltd
|
2006
|
|
|
|
| 219 |
|
A heuristic scheduling policy for multi-item, multi-machine production systems with time-varying (-)
|
Goncalves, Jose F
|
Institute of Management Sciences
|
1994
|
|
|
|
| 220 |
|
A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
|
Robert C. Leachman ; André Gascon
|
I N F O R M S
|
|
|
|
|