| 121 |
|
A methodology for constructing a financial systemic stress index: An application to Greece
|
Louzis, D. P.; Vouldis, A. T.
|
Elsevier Science B.V., Amsterdam.
|
2012
|
|
|
|
| 122 |
|
A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies
|
Herron, C.; Braiden, P. M.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 123 |
|
A methodology for ERP misfit analysis
|
Wu, J. H.; Shin, S. S.; Heng, M. S.
|
Elsevier Science B.V., Amsterdam.
|
2007
|
|
|
|
| 124 |
|
A methodology for integrating access control policies within database development
|
Abramov, J.; Anson, O.; Dahan, M.; Shoval, P.; Sturm, A.
|
Elsevier Science B.V., Amsterdam.
|
2012
|
|
|
|
| 125 |
|
A methodology for optimal product positioning with engineering constraints consideration
|
Kwong, C. K.; Luo, X. G.; Tang, J. F.
|
Elsevier Science B.V., Amsterdam.
|
2011
|
|
|
|
| 126 |
|
A methodology for organizing and quantifying the results of environmental scanning exercises
|
Tonn, B. E.
|
Elsevier Science B.V., Amsterdam.
|
2008
|
|
|
|
| 127 |
|
A methodology for selecting portfolios of projects with interactions and under uncertainty
|
Ghapanchi, A. H.; Tavana, M.; Khakbaz, M. H.; Low, G.
|
Elsevier Science B.V., Amsterdam.
|
2012
|
|
|
|
| 128 |
|
A methodology for selection problems with multiple, conflicting objectives and both qualitative and quantitative criteria
|
Erol, I.; Ferrell Jr, W. G.
|
Elsevier Science B.V., Amsterdam.
|
2003
|
|
|
|
| 129 |
|
A methodology for the choice of the best fitting continuous-time stochastic models of crude oil price
|
Kaffel, B.; Abid, F.
|
Elsevier Science B.V., Amsterdam.
|
2009
|
|
|
|
| 130 |
|
A methodology of technological foresight: A proposal and field study
|
Battistella, C.; De Toni, A. F.
|
Elsevier Science B.V., Amsterdam.
|
2011
|
|
|
|
| 131 |
|
A methodology to estimate impacts of domestic policies on deforestation: Compensated Successful Efforts for “avoided deforestation?? (REDD)
|
Combes Motel, P.; Pirard, R.; Combes, J. L.
|
Elsevier Science B.V., Amsterdam.
|
2009
|
|
|
|
| 132 |
|
A methodology to support decision making across the supply chain of an industrial distributor
|
Erol, I.; Ferrell Jr, W. G.
|
Elsevier Science B.V., Amsterdam.
|
2004
|
|
|
|
| 133 |
|
A method to determine minimum contract bids for incentive highway projects
|
Shr, J. F.; Chen, W. T.
|
Elsevier Science B.V., Amsterdam.
|
2003
|
|
|
|
| 134 |
|
A method to enhance volume flexibility in JIT production control
|
Moattar Husseini, S. M.; O'Brien, C.; Hosseini, S. T.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 135 |
|
A method used for evaluating bids in the chinese construction industry
|
Lai, K. K.; Liu, S. L.; Wang, S. Y.
|
Elsevier Science B.V., Amsterdam.
|
2004
|
|
|
|
| 136 |
|
A metric and topological analysis of determinism in the crude oil spot market
|
Barkoulas, J. T.; Chakraborty, A.; Ouandlous, A.
|
Elsevier Science B.V., Amsterdam.
|
2012
|
|
|
|
| 137 |
|
A microfoundation for increasing returns in human capital accumulation and the under-participation trap
|
Booth, A. L.; Coles, M.
|
Elsevier Science B.V., Amsterdam.
|
2007
|
|
|
|
| 138 |
|
A micro-foundation of local business cycles
|
Zhang, Q.
|
Elsevier Science B.V., Amsterdam.
|
2007
|
|
|
|
| 139 |
|
A micro-political perspective on subsidiary initiative-taking: Evidence from German-owned subsidiaries in France
|
Dorrenbacher, C.; Geppert, M.
|
Elsevier Science B.V., Amsterdam.
|
2009
|
|
|
|
| 140 |
|
A microsimulation analysis of the 2006 regime change in the Dutch disability scheme
|
van Sonsbeek, J. M.; Gradus, R. H.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|