1 |
|
A parallel genetic-neuro scheduler for job-shop scheduling problems
|
Lee, H. C.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
2 |
|
A perception-based model for EDI adoption in small businesses using a technology-organization-environment framework
|
Kuan, K. K.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
3 |
|
A performance comparison of pull type control mechanisms for multi-stage manufacturing
|
Karaesmen, F.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
4 |
|
A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
|
Artigues, C.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
5 |
|
A practical decomposition approach for a chemical substance scheduling problem
|
Van Bael, P.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
6 |
|
A practical solution to a newspaper distribution problem
|
Mantel, R. J.
|
ELSEVIER SCIENCE DIVISION
|
1993
|
|
|
7 |
|
A pragmatic view on process capability studies
|
Deleryd, M.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
8 |
|
A preliminary model for lost sizing in semiconductor manufacturing
|
Carmon, T. F.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
9 |
|
A process model cognitive biasing effects in information systems development and usage
|
Kirs, P. J.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
10 |
|
A process-oriented framework for the evaluation of managerial support systems
|
Vetschera, R.
|
ELSEVIER SCIENCE DIVISION
|
1995
|
|
|
11 |
|
A production ordering system for two-item, two-stage, capacity-constraint production and inventory model
|
Ishii, K.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
12 |
|
A production order quantity model with stochastic demand for a chocolate milk manufacturer
|
De Castro, E. L.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
13 |
|
A production planning and scheduling system at a chemical testing laboratory
|
Chase, R. B.
|
ELSEVIER SCIENCE DIVISION
|
1993
|
|
|
14 |
|
A progressive figure-based production planning system for a component manufacturer
|
Missbauer, H.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
15 |
|
A project activity scheduling problem with net present value measure
|
Sung, C. S.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
16 |
|
A proposed model of JIT purchasing in an integrated steel plant
|
Roy, R. N.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
17 |
|
Paradigm change in production management: New lead concepts towards higher competitiveness in technology based enterprises
|
Bullinger, H.-J.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
18 |
|
Parallel machine scheduling to minimize total tardiness
|
Yalaoui, F.; Chu, C.
|
ELSEVIER SCIENCE DIVISION
|
2002
|
|
|
19 |
|
Parallel machine scheduling with batch delivery costs
|
Wang, G.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
20 |
|
Parametric analysis of setup cost in the economic lot-sizing model without speculative motives
|
Hoesel, C. P.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|