1 |
|
A perspective on analytical prototype process
|
Dwivedi, S.; Ranga, P.; Lanka, R.; Lyons, D. W.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2005
|
|
|
2 |
|
A preference-performance hybrid method for surrogate model updating in engineering design optimisation
|
Shao, T.; Krishnamurty, S.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2009
|
|
|
3 |
|
A process modelling and simulation approach for business decision support in pre-conceptual product design
|
Lofstrand, M.; Isaksson, O.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
4 |
|
A product design method using macroscopic shape feature `complexity'
|
Ujiie, Y.; Matsuoka, Y.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2009
|
|
|
5 |
|
A proposition of 3D inertial tolerancing to consider the statistical combination of the location and orientation deviations
|
Adragna, P.-A.; Samper, S.; Pillet, M.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
6 |
|
Parametric matching selection approach for Satellite Gear Mechanism
|
Ping, Y.; Zhihua, L.; Daoguo, Y.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2008
|
|
|
7 |
|
Past, present and future of rapid prototyping
|
Wohlers, T.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2004
|
|
|
8 |
|
Perpendicular magnetic recording write head design
|
Mallary, M.; Benakli, M.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2008
|
|
|
9 |
|
Perspective of read heads for ultra-high recording densities and associated noise issues
|
Xi, H.; Shi, Y.; Mao, S.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2008
|
|
|
10 |
|
Perspectives and challenges for product reliability assurance in the product development process
|
Yadav, O.P.; Singh, N.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2008
|
|
|
11 |
|
Planning for new products in the extended enterprise: the automative scenario
|
Hidalgo, A.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2006
|
|
|
12 |
|
PLM as linkage process in a systems engineering framework
|
Messaadia, M.; Sahraoui, A.-E.-K.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2007
|
|
|
13 |
|
Polymer-based stents produced by rapid prototyping and tooling
|
Lim, C. S.; Chiang, W. M.; Ang, K. S.; Chua, C. K.; Ng, W. S.; Chai, G. B.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2004
|
|
|
14 |
|
Practical problem solving by TRIZ enriched with weighted average scoring
|
Yu, K. M.; Lau, T. C. T.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2007
|
|
|
15 |
|
Predicting vehicle cost using the T-method
|
Cudney, E.A.; Shah, P.A.; Kestle, R.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2010
|
|
|
16 |
|
Proactive Design for Manufacture through decision analysis
|
Holt, R.J.; Barnes, C.J.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2011
|
|
|
17 |
|
Process and impact of product data management implementation
|
Wognum, P. M.; Drongelen, I. C. K.-v.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2005
|
|
|
18 |
|
Process of two stages Analogy-based Design employing TRIZ
|
Tan, R.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2007
|
|
|
19 |
|
Product development processes - from deterministic to probabilistic: a Design for 6-Sigma approach to lean product validation, Part II
|
Khalaf, F.; Yang, K.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2006
|
|
|
20 |
|
Product development processes: from deterministic to probabilistic, Part I
|
Khalaf, F.; Yang, K.
|
INDERSCIENCE ENTERPRISES LIMITED
|
2006
|
|
|