| 1 |
|
A simulation study of hypothesis tests for differences in efficiencies
|
Banker, R. D.; Chang, H.
|
Elsevier
|
1992
|
|
|
|
| 2 |
|
A simulation study of unit exchange spares management of diesel locomotives in Indian railways
|
Kumar, N.;Vrat, P.;Sushil
|
Elsevier
|
1992
|
|
|
|
| 3 |
|
A study of heuristics of bi-directional multi-hoist production scheduling systems
|
Sun, T. C.;Lai, K. K.;Lam, K. K.;So, K. P.
|
Elsevier
|
1992
|
|
|
|
| 4 |
|
Scheduling of packaging lines in the process industry: An empirical investigation
|
Van Dam, P.;Gaalman, G.;Sierksma, G.
|
Elsevier
|
1992
|
|
|
|
| 5 |
|
Sensitivity analysis on CUSUM method
|
Radharamanan, R.;Galelli, A.;Alex, D. T.;Perez, L. L.
|
Elsevier
|
1992
|
|
|
|
| 6 |
|
Simulation of pull type manufacturing system for evaluating maintenance planning
|
Durmusoglu, S.
|
Elsevier
|
1992
|
|
|
|
| 7 |
|
Some practical issues in the assessment of nonconforming rates in a manufacturing process
|
Goh, T. N.
|
Elsevier
|
1992
|
|
|
|
| 8 |
|
Some unsolved problems in data envelopment analysis: A survey
|
Olesen, O. B.
|
Elsevier
|
1992
|
|
|
|