| 41 |
|
Scheduling in the two-machine flowshop with due date constraints
|
Lin, B. M.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
|
| 42 |
|
Scheduling of packaging lines in the process industry: An empirical investigation
|
Van Dam, P.
|
ELSEVIER SCIENCE DIVISION
|
1993
|
|
|
|
| 43 |
|
Scheduling with bicriteria: total flowtime and number of tardy jobs
|
Kondakci, S. K.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
|
| 44 |
|
Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system
|
Daniel, V.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
|
| 45 |
|
Scheduling with two job classes and setup times to minimize the number of tardy jobs
|
Gupta, J. N. D.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 46 |
|
Seasonality and the production-smoothing model
|
Gorman, M. F.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
|
| 47 |
|
Security threats to Internet: a Korean multi-industry investigation
|
Jung, B.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
|
| 48 |
|
Segregating space allocation models for container inventories in port container terminals
|
Kim, K. H.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
|
| 49 |
|
Selecting quality-based programmes in small firms: A comparison between the fuzzy linguistic approach and the analytic hierarchy process
|
Noci, G.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
|
| 50 |
|
Selection of an automated inspection system using multiattribute decision analysis
|
Pandey, P. C.
|
ELSEVIER SCIENCE DIVISION
|
1995
|
|
|
|
| 51 |
|
Selection of postharvest technology routes by mixed-integer linear programming
|
Maia, L. O. A.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
|
| 52 |
|
Self-assessment using the business excellence model: A study of practice and process
|
Ritchie, L.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
|
| 53 |
|
Self-directed teams in IS correlates for improved systems development work outcomes
|
Janz, B. D.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
|
| 54 |
|
Sensitivity analysis of rent replacement models
|
Kobbacy, K. A. H.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
|
| 55 |
|
Sensitivity analysis on CUSUM method
|
Radharamanan, R.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
|
| 56 |
|
Sensitivity of quadratic cost functionals under stochastically perturbed controls in inventory systems with delays
|
Cibej, J. A.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
|
| 57 |
|
Sensitivity study of the CUSUM control chart with an economic model
|
Simpson, J. R.
|
ELSEVIER SCIENCE DIVISION
|
1995
|
|
|
|
| 58 |
|
Sequencing method for products in consideration of assembly time
|
Kurashige, K.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
|
| 59 |
|
Sequential stability of the constant cost dynamic lot size model
|
Richter, K.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
|
| 60 |
|
Service system structure
|
Buzacott, J. A.
|
ELSEVIER SCIENCE DIVISION
|
2000
|
|
|
|