| 61 |
|
Setting preventive maintenance schedules when data are sparse
|
Percy, D. F.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
|
| 62 |
|
Setup utilization as a performance indicator in production planning and control
|
Kuik, R.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
|
| 63 |
|
Sharpening logistics customer service strategy planning by applying Kano's quality element classification
|
Huiskonen, J.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
|
| 64 |
|
Shortening the new product introduction cycle through electronic data transfer
|
Standish, R.
|
ELSEVIER SCIENCE DIVISION
|
1994
|
|
|
|
| 65 |
|
Simulated annealing approach for minimizing the makespan of the general job-shop
|
Satake, T.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
|
| 66 |
|
Simulating business and operations management-a learning environment for the electronics industry
|
Haapasalo, H.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
|
| 67 |
|
Simulation analyses of a maintenance float shop
|
Madu, C. N.
|
ELSEVIER SCIENCE DIVISION
|
1993
|
|
|
|
| 68 |
|
Simulation analysis of a pull-push system for an electronic assembly line
|
Savsar, M.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
|
| 69 |
|
Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: A case study
|
Ertay, T.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
|
| 70 |
|
Simulation modelling and analysis of a JIT production system
|
Baykoc, O. F.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
|
| 71 |
|
Simulation of activity costs for the reengineering of production systems
|
Zulch, G.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
|
| 72 |
|
Simulation of pull type manufacturing system for evaluating maintenance planning
|
Durmusoglu, S.
|
ELSEVIER SCIENCE DIVISION
|
1993
|
|
|
|
| 73 |
|
Simulation of supply chain behaviour and performance in an uncertain environment
|
Petrovic, D.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
|
| 74 |
|
Simulation study of CONWIP for a cold rolling plant
|
Huang, M.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
|
| 75 |
|
Simultaneous engineering - correlates of success
|
Hauck, W. C.
|
ELSEVIER SCIENCE DIVISION
|
1997
|
|
|
|
| 76 |
|
Single-machine earliness-tardiness scheduling about a common due date with tolerances
|
Weng, M. X.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 77 |
|
Single machine scheduling to meet due times under shutdown constraints
|
Asano, M.
|
ELSEVIER SCIENCE DIVISION
|
1999
|
|
|
|
| 78 |
|
Single machine scheduling using dominance relation to minimize earliness subject to ready and due times
|
Asano, M.
|
ELSEVIER SCIENCE DIVISION
|
1996
|
|
|
|
| 79 |
|
Small random perturbations of just-in-time systems
|
Bulinskaya, E.
|
ELSEVIER SCIENCE DIVISION
|
2001
|
|
|
|
| 80 |
|
Software development cost estimationIntegrating neural network with cluster analysis
|
Lee, A.
|
ELSEVIER SCIENCE DIVISION
|
1998
|
|
|
|