| 641 |
|
Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times
|
Ganesan, V. K.; Sivakumar, A. I.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 642 |
|
Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
|
Subai, C.; Baptiste, P.; Niel, E.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 643 |
|
Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study
|
Xi, Y.; Jang, J.
|
Elsevier Science B.V., Amsterdam.
|
2012
|
|
|
|
| 644 |
|
Scheduling jobs with values dependent on their completion times
|
Janiak, A.; Krysiak, T.
|
Elsevier Science B.V., Amsterdam.
|
2012
|
|
|
|
| 645 |
|
Scheduling jobs with values exponentially deteriorating over time
|
Voutsinas, T. G.; Pappis, C. P.
|
Elsevier Science B.V., Amsterdam.
|
2002
|
|
|
|
| 646 |
|
Scheduling multiple robots in a no-wait re-entrant robotic flowshop
|
Che, A.; Chabrol, M.; Gourgand, M.; Wang, Y.
|
Elsevier Science B.V., Amsterdam.
|
2012
|
|
|
|
| 647 |
|
Scheduling of a two-machine flowshop with availability constraints on the first machine
|
Allaoui, H.; Artiba, A.; Elmaghraby, S. E.; Riane, F.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 648 |
|
Scheduling of batch plants: Constraint-based approach and performance investigation
|
Huang, W.; Chen, B.
|
Elsevier Science B.V., Amsterdam.
|
2007
|
|
|
|
| 649 |
|
Scheduling of multi-buyer joint replenishments
|
Chan, C. K.; Yuk-on Li, L.; To Ng, C.; Kin-sion Cheung, B.; Langevin, A.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|
| 650 |
|
Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm
|
Lee, D. H.; Cao, Z.; Meng, Q.
|
Elsevier Science B.V., Amsterdam.
|
2007
|
|
|
|
| 651 |
|
Scheduling on a single machine with family setups to minimize total tardiness
|
Schaller, J.
|
Elsevier Science B.V., Amsterdam.
|
2007
|
|
|
|
| 652 |
|
Scheduling on identical machines with batch arrivals
|
Chung, T. P.; Liao, C. J.; Su, L. H.
|
Elsevier Science B.V., Amsterdam.
|
2010
|
|
|
|
| 653 |
|
Scheduling parallel machines with resource-dependent processing times
|
Su, L. H.; Lien, C. Y.
|
Elsevier Science B.V., Amsterdam.
|
2009
|
|
|
|
| 654 |
|
Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines
|
Sun, K.; Li, H.
|
Elsevier Science B.V., Amsterdam.
|
2010
|
|
|
|
| 655 |
|
Scheduling sales force training: Theory and evidence
|
Krishnamoorthy, A.; Misra, S.; Prasad, A.
|
Elsevier Science B.V., Amsterdam.
|
2005
|
|
|
|
| 656 |
|
Scheduling with processing set restrictions: A survey
|
Leung, J. Y.; Li, C. L.
|
Elsevier Science B.V., Amsterdam.
|
2008
|
|
|
|
| 657 |
|
Scheduling with processing set restrictions: PTAS results for several variants
|
Epstein, L.; Levin, A.
|
Elsevier Science B.V., Amsterdam.
|
2011
|
|
|
|
| 658 |
|
Schelling′s model revisited: Residential sorting with competitive bidding for land
|
O′Sullivan, A.
|
Elsevier Science B.V., Amsterdam.
|
2009
|
|
|
|
| 659 |
|
Schelling's spatial proximity model of segregation revisited
|
Pancs, R.; Vriend, N. J.
|
Elsevier Science B.V., Amsterdam.
|
2007
|
|
|
|
| 660 |
|
SCHIP expansion and parental coverage: An evaluation of Wisconsins BadgerCare
|
Wolfe, B.; Kaplan, T.; Haveman, R.; Cho, Y.
|
Elsevier Science B.V., Amsterdam.
|
2006
|
|
|
|